Can I send a rough requirement before final drawings are ready?
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Share your application, target specs, and quantity plan. We will respond with practical engineering and sourcing support.
Submit your requirements to generate a structured RFQ email for engineering review.
Inquiry Email
Please include application, peak/continuous torque, speed range, voltage/current limit, outer diameter, axial length, cooling method, quantity, and drawings or reference samples.
Instant Chat
+86 188 5797 1991
Share torque-speed, package, cooling, and sample quantity in the first message.
| Required Item | Example | Why It Helps |
|---|---|---|
| Target motor family | Frame size / torque class / closed-loop | Quickly narrows viable models and quote range. |
| Torque at speed | 1.2 N·m at 600 RPM | Prevents over-reliance on holding torque only. |
| Voltage and current limit | 72 V DC bus, 180 A peak phase current | Aligns winding, back EMF, inverter, and thermal assumptions. |
| Mechanical interface | Shaft, flange, connector drawing revision | Avoids sample mismatch and assembly rework. |
| Cooling and environment | Forced air, liquid jacket, oil, ambient temp, IP target | Separates peak torque from sustainable continuous output. |
| Quantity plan | Prototype qty + annual forecast | Improves lead-time and pricing accuracy. |
| Drawings or reference sample | STEP file, torque-speed map, current motor model | Speeds up airgap, shaft, flange, and validation review. |
| Destination and terms | Country, Incoterm, requested ship date | Aligns packaging, documents, and shipping plan early. |
Yes. Send your current assumptions first, then mark pending items clearly so we can return a provisional quote scope.
Use a revision-controlled change request with effective lot and impact scope agreed by both teams.
Yes. Please list required document types in the RFQ stage so they are included in validation and delivery planning.
If your team needs a fast start, use this structure in the first email. It improves quote precision and reduces clarification cycles.
| Output | Purpose | Buyer Action |
|---|---|---|
| Model and architecture direction | Narrow viable options against torque-speed and interface assumptions. | Confirm baseline model path before cost-detail discussion. |
| RFQ clarification list | Close data gaps that affect pricing and lead-time accuracy. | Return missing values and drawing references in one reply. |
| Validation recommendation | Define sample test scope and acceptance evidence for technical sign-off. | Align internal engineering and procurement gates before PO. |