Assembly planning ·

AFPM Motor Assembly Process

Estimate one-face magnetic pull.

Assembly force screening

260 mm reference example. Screening only; not a fixture specification.

Range: 100–600 mm

50–500 mm; OD − ID ≥ 30 mm

Range: 0.5–3 mm per face

Range: 2–15 mm

Room-temperature model Br; see calculation basis

Axial force path layout

Pre-mag requires anti-snap guides

Changes the production review plan; forces stay unchanged

Assembly magnetic contribution: 12.21 kN per face.

Assembly magnetic pull / face

12.21 kN

Nominal-gap estimate; not total fixture load.

After magnetization / face

12.21 kN

Model Bg = 1.106 T; full load returns after magnetization.

Half-gap scenario / face

14.25 kN

Illustrative accidental overtravel to half the input gap; not a measured peak or safety envelope.

Energized gap sensitivity / face

3637.1 N/mm

Magnitude of dF/dg for this model; net two-face stiffness is not determined.

Your process review plan

SSDR: review each rotor and the second-rotor insertion load path; this one-face estimate does not calculate rotor-to-rotor attraction.

Pilot: use a controlled trial to establish repeatability, gauge capability, cure traceability, and process hold points before estimating takt time.

Illustrative allocation only: rotor-face TIR ≤ 0.080 mm (maximum minus minimum, without ±); stator flatness ≤ 0.050 mm. These editorial allocations use 8% and 5% of the gap, capped at 0.100 and 0.060 mm. They are not production tolerances.

Next: supply the magnetic circuit, rotor drawing, speed, thermal envelope, and bearing arrangement for a load-case review before selecting tooling.

Build the complete clearance budget

Five-phase review checklist — release settings required

Phase 1Magnet Array & Retention Review
Review hold point
  • •Verify magnet polarity and restrain each pole in an approved indexing fixture.
  • •Qualify adhesive, surface preparation, bondline, and cure for the actual magnet coating and rotor substrate.
  • •Assess mechanical retention against speed, temperature, fatigue, and the validated rotor load case.
Required evidence: Approved retention drawing and traceable adhesive/cure records; no universal cure schedule or speed cutoff is inferred.
⚠️ Safety Precaution: Restrain magnets against uncontrolled attraction; use the approved handling procedure.
Phase 2Stator Insulation & Datum Preparation
Review hold point
  • •Use the qualified potting or impregnation procedure for the winding system.
  • •Measure datum flatness and insulation integrity after cure; machine an active face only when the design permits it.
Required evidence: Drawing-defined flatness and insulation acceptance; no generic grinding or oven recipe.
Phase 3Bearing & Hub Metrology
Review hold point
  • •Use bearing-supplier mounting and preload instructions; route fitting loads through the supported ring.
  • •Record rotor-face TIR as maximum minus minimum reading over a full revolution at a defined radius.
Required evidence: Released bearing arrangement, datum scheme, clearance/preload, and runout limits.
Phase 4Controlled Closure & Gap Verification
Review hold point
  • •SSDR: review each rotor and the second-rotor insertion load path; this one-face estimate does not calculate rotor-to-rotor attraction.
  • •Use an engineered restraint and controlled approach with stops; verify fixture deflection and load versus travel.
  • •Measure all accessible gaps around the circumference through a full revolution and repeat at the defined thermal/load condition.
Required evidence: Approved minimum clearance and reaction path throughout the stroke; one-face force is not press capacity.
⚠️ Safety Precaution: Keep hands outside the closure zone. Validate restraint and release/rework arrangements before approach.
Phase 5Magnetization & End-of-Line Release
Review hold point
  • •Recheck polarity and phase sequence on the completed machine.
  • •Set balance, dielectric, surge, resistance, back-EMF, vibration, and spin tests from the motor rating, applicable standards, and customer control plan.
Required evidence: Record approved limits, calibrated equipment, test conditions, and unit-level results; this tool does not certify release.

Process risk register — qualitative, not a scored FMEA

Assembly failure modes and review actions
Potential Failure ModeSeverityRoot CauseProcess Mitigation Action
Uncontrolled magnetic closureCriticalLoss of restraint or an unverified load path.Validate restraint, stops, travel monitoring, and recovery under the complete magnetic load case.
Rotor/stator contactHighTolerance stack, thermal movement, or disc deflection consumes clearance.Allocate a full cold/hot clearance budget and verify all gaps at specified load and speed.
Magnet releaseCriticalBond or retention failure under centrifugal and thermal loads.Qualify the actual joint and containment design; use a controlled rotor validation plan.
Insulation failureHighVoids, damage, or unsuitable insulation for inverter stress.Agree insulation qualification and production tests with the winding designer.
Bearing damageHighAssembly load transmitted through rolling contacts or incorrect preload.Use supplier mounting limits and a verified fixture reaction path.

Need Custom Fixture Design or OEM Assembly Line Engineering?

Share your drawings and screening inputs for an engineering review. Unknown dimensions can be marked pending.

Inquiry Email

[email protected]

Please include application, peak/continuous torque, speed range, voltage/current limit, outer diameter, axial length, cooling method, quantity, and drawings or reference samples.

Instant Chat

+86 188 5797 1991

Share torque-speed, package, cooling, and sample quantity in the first message.

Four decisions before specifying tooling

Review the complete axial load path

A per-face magnetic estimate can identify a load worth investigating. It cannot establish restraint, press capacity, or guide stiffness.

Basis and limits

Budget clearance at the operating condition

Separate TIR, flatness, bearing movement, thermal growth, and structural deflection. A cold nominal gap alone cannot prove clearance.

Basis and limits

Qualify the actual retention joint

Adhesive chemistry and joint geometry matter. Supplier typical data support candidate selection; they do not release a rotor.

Basis and limits

Agree the acceptance plan before a pilot

Define balancing and insulation qualification for the actual design, then specify calibrated production checks and traceable results.

Basis and limits

Calculation basis, reproducible outputs, and limits

For a uniform field normal to an active face, use magnetic pressure B²/(2μ₀) times the effective area. This is an approximation supported by MIT course notes and Parviainen’s equation 4.1. The reluctance model below is a declared screening assumption; it does not reconstruct the complete motor circuit.

A = π(OD² − ID²)/4; Aeff = 0.76 × A.

Bg = Br × lm / (lm + 1.05 × g).

F(g) = Bg² × Aeff / (2μ₀), where μ₀ ≈ 4π × 10⁻⁷ H/m.

|dF/dg| = 2 × 1.05 × F / (lm + 1.05 × g), in N/mm when lm and g are in mm.

Default example — 260/160 mm annulus, 6 mm magnet, 1 mm gap, N42SH model Br = 1.30 T
QuantityReproducible model valueMeaning / unresolved input
Active annulus / effective magnet area329.87 / 250.70 cm²76% coverage is an assumption, not a drawing measurement.
Energized field / force per face1.106 T / 12.21 kNRoom-temperature idealized magnetic circuit.
Half-gap scenario14.25 kN at 0.5 mmAn overtravel sensitivity example, not a maximum assembly load.
One-face gap sensitivity3637.1 N/mmDerivative magnitude; not net rotor stiffness or a fixture stiffness requirement.
Press / guides / bearing preloadUndeterminedNeeds circuit, approach travel, force path, stiffness, fits, and design load cases.

Br assumptions: N38SH 1.22 T; N42SH 1.30 T; N45UH 1.35 T; N52H 1.44 T. Confirm the actual supplier B-H curve and temperature. Leakage, saturation, pole geometry, armature current, fringing, flexure, and multi-gap coupling are excluded. No confidence interval or conservative bound is established. Coreless, Halbach, ferrite, saturated, and operating-current cases require a separate model.

AFPM assembly tool default run showing 12.21 kN magnetic pull per face and half-gap force sensitivity
Software run captured October 21, 2026: EV preset, 260/160 mm annulus, 6 mm magnet, 1 mm gap and N42SH. This reproduces the calculation above; it is not a measured motor test or an approved fixture specification.

Topology changes the load path and closure sequence

SSSR axial stackRgapS
SSSR · axial stack schematic
SSDR axial stackRgapSgapR
SSDR · axial stack schematic
DSSR axial stackSgapRgapS
DSSR · axial stack schematic
Topology review — R = rotor; S = stator. Geometry-specific engineering interpretation, not a prescribed sequence.
LayoutMain load questionClosure evidence required
SSSR: one stator / one rotorWhere does the one-sided magnetic force react?Bearing, housing, rotor, and restraint load paths in assembly and operation.
SSDR: one stator / two rotorsHow is the second rotor restrained as the magnetic circuit closes?Both discs, inter-rotor attraction, common hub, and fixture reaction versus travel.
DSSR: two stators / one rotorHow does axial offset upset nominal force cancellation?Both gap forces, net force versus offset, bearing support, and disc deflection.

Parviainen discusses cancellation and manufacturing misalignment for a dual-stator prototype; cancellation at a centered operating point does not remove each face’s load. Tool topology selections change these review questions, while the displayed force remains a one-face approximation. Study and scope.

A five-phase assembly review with release hold points

Use this sequence to organize a drawing-specific work instruction. Each hold point needs an approved setting and evidence; the page does not provide an executable universal SOP.

  1. Phase 1: Magnet Array & Retention Review

    Approved retention drawing and traceable adhesive/cure records; no universal cure schedule or speed cutoff is inferred.

  2. Phase 2: Stator Insulation & Datum Preparation

    Drawing-defined flatness and insulation acceptance; no generic grinding or oven recipe.

  3. Phase 3: Bearing & Hub Metrology

    Released bearing arrangement, datum scheme, clearance/preload, and runout limits.

  4. Phase 4: Controlled Closure & Gap Verification

    Approved minimum clearance and reaction path throughout the stroke; one-face force is not press capacity.

  5. Phase 5: Magnetization & End-of-Line Release

    Record approved limits, calibrated equipment, test conditions, and unit-level results; this tool does not certify release.

Post-assembly magnetization adds a qualified magnetization step and polarity verification before spin/electrical release. The tool adapts its checklist to magnet timing and topology.

Build a clearance budget instead of copying a tolerance

For a defined datum and load condition, allocate the nominal clearance to assembly offsets, surface errors, bearing motion, thermal movement, disc deflection, and measurement uncertainty. Evaluate worst combinations in the approved stack; the entries below are review inputs, not a validated tolerance sum.

Illustrative 1.000 mm nominal gap — allocation examples, with unresolved contributions shown explicitly
ContributionKnown / example / unknownHow to close the gap
Nominal gap1.000 mm — entered design targetVerify at specified radius, angle, temperature, and load.
Rotor-face TIR0.080 mm — editorial allocation (8%)TIR is max minus min over 360°, without ±. Datum and stack mapping require design review.
Stator flatness0.050 mm — editorial allocation (5%)Independent surface allocation; actual acceptance comes from the drawing.
Bearing motion / preloadUnknownObtain supplier limits and the actual bearing arrangement.
Thermal movement / magnetic deflectionUnknownUse the specified cold/hot load envelope and structural model or measurements.
Gauge uncertainty / assembly offsetsUnknownQualify measurement capability and assembly datum repeatability.
Minimum running clearanceUndeterminedCannot be released while stack contributions and their directions remain unknown.

The tool scales only the two labeled example allocations: TIR = min(0.100 mm, 8% of gap) and flatness = min(0.060 mm, 5% of gap). Neither is an industry standard. Do not subtract them from nominal gap and infer a safe running clearance.

Separate adhesive selection from rotor retention release

Supplier evidence distinguishes chemistry and application; it does not certify the joint
Candidate / methodVerified scopeQualification still required
3M DP490Two-component epoxy; condition-specific typical data in the July 2024 TDS.Magnet coating, substrate, surface preparation, cure, bondline, fatigue, fluids, and temperature.
LOCTITE 648Anaerobic urethane methacrylate retaining compound for cylindrical fitting parts; May 2021 TDS.Supplier confirmation for actual joint geometry. Do not substitute it into a generic two-part epoxy procedure.
Mechanical containmentDesign-specific retention option; no universal RPM cutoff established here.Load, thermal growth, fatigue, balance, electrical losses, manufacturing tolerances, and controlled validation.

Read the 3M and Henkel source limits. A product’s typical coupon strength is not the allowable stress of a rotor bond. For retention review, calculate the magnet load from mass, radius, and speed, then validate the actual joint and containment at the agreed conditions.

Specify qualification and end-of-line tests separately

Test-plan inputs — no universal voltage, balance grade, or pass threshold is implied
GatePurposeInformation needed before acceptance
Geometry and free rotationConfirm assembled datums and clearance.Drawing limits, measurement radius, bearing preload, cold/hot conditions, and minimum clearance.
Rotor balancingControl residual unbalance for service operation.Rigid/flexible behaviour, speed range, agreed grade/limits, correction planes, and repeatability.
Insulation qualificationEstablish suitability of the winding system.Type I/other system, terminal waveform, converter stress, applicable standard edition, and qualification method.
Routine electrical checksDetect assembly defects on each unit.Approved resistance, insulation, dielectric/surge methods and settings, calibrated equipment, and traceable results.
Back-EMF, vibration, and spinConfirm the agreed functional baseline.Speed, temperature, phase measurement method, containment, and design-specific acceptance limits.

ISO 21940-11 addresses rotors with rigid behaviour. The BSI catalogue for EN 60034-18-41 identifies Type I insulation qualification and quality-control scope. Public catalogue summaries do not establish this motor’s production test settings.

Choose the next production investment from evidence

Production choices — qualitative review recommendations; cost, yield, and cycle time are unknown until trial or quotation
Stage / routeBenefit soughtCost or mismatch riskMinimum next action
PrototypeExpose load paths and rework issues early.A prototype success may hide variation and operator dependence.Record each build, actual loads, dimensions, and rework steps.
PilotEstablish repeatability and inspection capability.Premature automation can lock in an unstable datum or cure process.Run controlled trials and measure process and gauge capability.
SeriesMaintain traceability and monitored closure.Automation economics depend on takt, uptime, yield, and changeover.Approve the control plan, recovery logic, and capability evidence before line purchase.
Post-assembly magnetizationReduce magnetic handling load before magnetization.Magnetizer access, field penetration, and verified pole pattern may not be feasible.Ask the magnetizer supplier to review the complete assembled magnetic circuit.

Three worked screening scenarios

Illustrative calculations using the same model as the tool, not customer case studies, measured outcomes, or validated motor performance. Use the corresponding EV, UAV, or Servo preset to reproduce them.

Pilot EV packaging example

SSDR · OD/ID 260/160 mm · gap 1.0 mm · magnet 6.0 mm · N42SH · pre-magnetized.

12.21 kN / face

Decision: Review second-rotor restraint and the rotor-to-rotor circuit before requesting a fixture concept.

Release evidence remains pending; no actual deflection, yield, or vibration improvement is claimed.

Reproduce in the tool

Prototype UAV packaging example

SSSR · OD/ID 160/90 mm · gap 0.8 mm · magnet 4 mm · N52H · pre-magnetized.

5.89 kN / face

Decision: Check the sustained axial reaction and lightweight housing deflection before committing to the bearing arrangement.

Release evidence remains pending; no actual deflection, yield, or vibration improvement is claimed.

Reproduce in the tool

Series servo packaging example

DSSR · OD/ID 320/190 mm · gap 1.2 mm · magnet 7 mm · N45UH · pre-magnetized.

20.61 kN / face

Decision: Model force imbalance against rotor offset, then define monitored closure and gap inspection hold points.

Release evidence remains pending; no actual deflection, yield, or vibration improvement is claimed.

Reproduce in the tool

When to stop screening and commission a design review

Misuse risk

A one-face result used as a press rating can omit reaction loads, stiffness, overtravel, and stored energy.

Next: Review the complete load-versus-travel and recovery case with the fixture designer.

Cost risk

A detailed fixture or line quotation before datum and cure validation can create rework and inspection costs.

Next: Start with a measured pilot and explicit unknowns; agree capability targets before automation.

Scenario mismatch

Coreless, Halbach, ferrite, flexible rotors, operating-current, or multi-gap circuits are outside this estimate’s verified scope.

Next: Use a geometry-specific magnetic/structural model and the corresponding validation plan.

If the form cannot produce a result, load a reference preset or send the available drawing with missing dimensions marked pending. Mechanical insertion force, material temperature capability, production yield, cycle time, and cost remain undetermined by this page.

Primary evidence and what it can support

Published by Magatom Dynamics Co., Ltd.. Published: . Last updated: .

Sources checked October 21, 2026. Document dates are shown separately from this review date. Supplier revisions and applicable standard editions must be confirmed for procurement; catalogue scope is not full-text conformity evidence.

Asko Parviainen — AFPM low-speed machine design, doctoral thesis

2005; printed pp. 74 and 87, equation 4.1

One-face attraction approximation, axial-load cancellation with centered geometry, and assembly load concerns. The thesis gives 7.3 kN per stator for one modeled prototype at a 1.5 mm gap.

Limit: A specific machine study, not a universal force range, tooling capacity, or production tolerance.

MIT OpenCourseWare — Electromagnetics and Applications

2011 notes, hosted in the Spring 2009 course; §6.3.2, equations 6.3.29–30

Magnetic pressure and the area-times-pressure force approximation in an idealized air gap.

Limit: Supports the pressure relation. The Br values, coverage, and single-gap reluctance approximation used here are declared screening assumptions.

ISO 21940-11:2016 — Rotor balancing with rigid behaviour

2016 edition; official catalogue checked 2026-10-21

Procedures and unbalance tolerances for rotors that behave rigidly.

Limit: The public scope does not choose an AFPM balance grade, correction-plane count, or speed limit. Review the applicable edition and rotor behaviour with the designer.

3M Scotch-Weld DP490 — Technical Data Sheet

July 2024 revision, English-Canada

DP490 is a two-component epoxy; the sheet provides condition-specific handling, cure, and strength data.

Limit: 3M identifies these as typical data. They do not qualify a magnet coating, bondline, operating temperature, or rotor retention design.

Henkel LOCTITE 648 — Technical Data Sheet

May 2021 revision

An anaerobically curing urethane methacrylate retaining compound intended for cylindrical fitting parts.

Limit: It is not a two-part epoxy. A cylindrical-fit application does not establish suitability for an exposed flat magnet-to-disc joint.

BSI catalogue — BS EN 60034-18-41:2014+A1:2019

Catalogue scope checked 2026-10-21

Qualification and quality-control tests for Type I, partial-discharge-free insulation systems in converter-fed rotating machines.

Limit: This scope is not a universal production Hi-Pot or PDIV setting. Obtain the applicable standard and agree test conditions for the actual winding and drive.

AFPM assembly decisions: frequently asked questions

Using the screening tool

What does the AFPM motor assembly process tool calculate?

It estimates uniform-field attraction on one active face from dimensions and an illustrative magnet Br, compares a half-gap scenario, and builds a topology and production review checklist. It does not size a press or release a manufacturing process.

Why do topology selections not multiply the force?

A multi-gap machine needs its complete magnetic circuit and reaction path modeled. This tool keeps the same one-face approximation and changes the review plan; it does not invent topology-specific force multipliers.

Does zero force in post-assembly magnetization mean assembly is load-free?

Zero is only the ideal magnetic contribution before magnetization. Mechanical fits, friction, residual magnetism, and handling loads remain unknown. The tool separately shows the magnetic load after magnetization.

Can I use the half-gap result as a maximum tooling load?

No. It is an explicit overtravel scenario at half the entered gap, not a measured peak or a worst-case bound. Fixture capacity needs validated load-versus-travel data, restraint, stiffness, and the complete reaction path.

Specifying the assembly process

How should runout and gap variation be specified?

Specify the datum, measurement radius, rotation, thermal and load condition, and minimum clearance. Total indicated runout is the maximum minus minimum reading over a revolution; it is a nonnegative span, not a ± value.

Are the suggested flatness and runout allocations acceptance limits?

No. The 5% flatness and 8% runout allocations are editorial examples with caps, not sourced tolerances. Bearing movement, thermal growth, disc deflection, assembly offsets, and measurement uncertainty must also fit the released clearance budget.

Are DP490 and LOCTITE 648 interchangeable magnet adhesives?

No. 3M identifies DP490 as a two-component epoxy; Henkel identifies 648 as an anaerobic retaining compound for cylindrical fitting parts. Qualify the actual joint, coating, cure, and environment with the supplier.

At what speed is mechanical magnet retention required?

This page establishes no universal RPM cutoff. Magnet mass and radius, speed, temperature, bond strength, fatigue, and the containment design determine the retention load case. Release requires design-specific analysis and controlled validation.

Validation and sourcing decisions

Which rotor balance grade should I request?

Ask the designer to specify rotor behaviour, service speed, permissible residual unbalance, and correction planes. ISO 21940-11 covers rigid-behaviour rotors; diameter alone cannot select G1.0 or G2.5.

Which electrical tests release a finished motor?

Agree the insulation system, rated voltage, inverter terminal stress, test method, voltage, duration, and acceptance criteria. Type I insulation qualification and routine production tests have different purposes. This tool supplies no universal electrical test voltage.

How does production volume change the recommendation?

The volume selection changes the review plan from unit-level measurement to pilot capability or series monitoring and traceability. It does not change the physics or prove that a particular automation level is economical.

What should I send when dimensions or test limits are unknown?

Send available drawings, topology, magnet condition, expected speed, thermal envelope, bearing arrangement, volume, and known constraints. Mark missing fields pending and ask for a load-case and control-plan review before requesting tooling.

Prepare an assembly engineering review

Include drawings, topology, magnetic circuit, magnet condition, operating speed and thermal envelope, bearing arrangement, expected volume, and unresolved constraints. The tool’s contact action includes your current inputs and labels its estimates as provisional.

Inquiry Email

[email protected]

Please include application, peak/continuous torque, speed range, voltage/current limit, outer diameter, axial length, cooling method, quantity, and drawings or reference samples.

Instant Chat

+86 188 5797 1991

Share torque-speed, package, cooling, and sample quantity in the first message.